{
  "reviewed": "2026-10-07",
  "attribution": "Editorial supplement: Superpower Daily, based on cited Tesla disclosures. Epoch source files are unchanged. Company H100e and compute MW are not assumed equivalent to Epoch peak-FP8 H100 equivalents or IT MW.",
  "facilities": [
    {
      "id": "tesla-cortex-texas",
      "name": "Tesla Cortex \u00b7 Gigafactory Texas",
      "owner": "Tesla",
      "ownerConfidence": "confident",
      "users": [
        {
          "name": "Tesla",
          "confidence": "confident"
        }
      ],
      "country": "United States",
      "city": "Austin",
      "state": "Texas",
      "address": "Gigafactory Texas, Austin, Texas",
      "coordinates": [
        -97.62,
        30.22
      ],
      "operating": true,
      "compute": null,
      "power": null,
      "cost": null,
      "chipTypes": [
        "NVIDIA GPUs; current per-cluster mix not disclosed"
      ],
      "description": "Training AI for the physical world: vehicle autonomy and humanoid robots. The campus contains two separately reported clusters, Cortex 1 and Cortex 2.",
      "estimationMethods": [
        "Tesla investor disclosures; no conversion to Epoch capacity units"
      ],
      "sources": [
        {
          "title": "Tesla Q2 2026 update \u00b7 latest cluster status and MW disclosures",
          "url": "https://ir.tesla.com/_flysystem/s3/sec/000162828026049213/tsla-20260722-gen.pdf"
        },
        {
          "title": "Tesla Q1 2026 update \u00b7 Cortex 2 online and H100e disclosures",
          "url": "https://ir.tesla.com/_flysystem/s3/sec/000162828026026551/tsla-20260422-gen.pdf"
        },
        {
          "title": "Tesla Q4 2025 update \u00b7 Cortex 2 construction",
          "url": "https://ir.tesla.com/_flysystem/s3/sec/000162828026003837/tsla-20260128-gen.pdf"
        },
        {
          "title": "Tesla \u00b7 Gigafactory Texas location",
          "url": "https://www.tesla.com/giga-texas"
        },
        {
          "title": "Tesla Q2 2025 update \u00b7 historical NVIDIA H200 expansion at Gigafactory Texas",
          "url": "https://www.sec.gov/Archives/edgar/data/1318605/000162828025035738/exhibit991.htm"
        }
      ],
      "calculations": "",
      "sourceUrl": "https://ir.tesla.com/_flysystem/s3/sec/000162828026049213/tsla-20260722-gen.pdf",
      "footprintM2": 0,
      "shapes": [],
      "extent": null,
      "timeline": [],
      "chipRecords": [],
      "provenance": "Superpower Daily editorial supplement",
      "sourceOwner": "Tesla",
      "locationNote": "Approximate campus reference point; individual clusters are not separately geolocated. No roof outlines are supplied.",
      "capacityNote": "Comparable operating H100-equivalents and IT power are not established. Tesla\u2019s installed-capacity disclosures are presented in its own units and excluded from Epoch-based totals and rankings. Installed capacity is not a measured workload or electricity draw.",
      "expansionNote": "Tesla reports further ramping through 2026; a future increment in comparable compute or IT MW is not established.",
      "clusters": [
        {
          "name": "Cortex 1",
          "disclosures": [
            {
              "date": "2026-01-28",
              "status": "Production",
              "installed": ">100k H100e (Tesla definition)",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026003837/tsla-20260128-gen.pdf"
            },
            {
              "date": "2026-04-22",
              "status": "Production",
              "installed": ">100k H100e (Tesla definition)",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026026551/tsla-20260422-gen.pdf"
            },
            {
              "date": "2026-07-22",
              "status": "Production",
              "installed": ">90 MW (Tesla-reported compute capacity)",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026049213/tsla-20260722-gen.pdf"
            }
          ]
        },
        {
          "name": "Cortex 2",
          "disclosures": [
            {
              "date": "2026-01-28",
              "status": "Construction",
              "installed": "Not disclosed",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026003837/tsla-20260128-gen.pdf"
            },
            {
              "date": "2026-04-22",
              "status": "Early ramp; training workloads started",
              "installed": ">130k H100e (Tesla definition)",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026026551/tsla-20260422-gen.pdf"
            },
            {
              "date": "2026-07-22",
              "status": "Production",
              "installed": ">115 MW (Tesla-reported compute capacity)",
              "source": "https://ir.tesla.com/_flysystem/s3/sec/000162828026049213/tsla-20260722-gen.pdf"
            }
          ]
        }
      ]
    }
  ],
  "ownerLabels": [
    {
      "sourceOwner": "SpaceXAI",
      "label": "SpaceX / xAI",
      "source": "https://x.ai/news/xai-joins-spacex",
      "date": "2026-02-02"
    }
  ]
}
