Research investigation R0922 / comparison

Existing Nuclear Power vs. Future Reactors: The AI Power-Contract Timeline

The bounded sample mixes operating-plant purchases with prospective generation, uprates and development rights. A power headline is not, by itself, a common measure of electricity available to an AI load on a given date.

Archived snapshotv1Sep 22, 2026
Verified observations
14

13 measured fields

Supported claims
8

8 material findings

Cited sources
10

9 primary or authoritative

Research score
84

Automated topic and evidence score

Interactive figureExisting Nuclear Power vs. Future Reactors: The...
CSV JSON
Data status1 verified record across 1 period

Snapshot only. There is not enough history to claim a trend yet.

Verified observationHover or focus any mark for exact valuesLast updated Sep 22, 2026

Version ledger

Frozen public editions

Each edition preserves the records, method, sources, and downloads available at publication time.

  1. v1 / latestSep 22, 202614 records / 10 sources

    Initial public snapshot with 14 records and 10 cited sources.

Coverage note

Evidence cutoff: September 22, 2026. This is a five-arrangement sample, not a census of AI power deals. Recovering the saved evidence did not add new collection or experimentation.

Dataset ID
spd:existing-nuclear-power-vs-future-reactors-the-ai-power-contract-timeline-070a4b87
Stable URL
/research/existing-nuclear-power-vs-future-reactors-the-ai-power-contract-timeline-070a4b87
Version
v1
Coverage
2025-09-29
Records
14
Fields
7
Updated

Read the data

The records behind the figure

CSV JSON
Existing Nuclear Power vs. Future Reactors: The AI Power-Contract Timeline data records
EntityMetricValueUnitObservedSourceTransform
Meta Prometheus AI clusterannounced AI capacity1 GWGW2025-09-29https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai
Google Finland AI infrastructureannounced construction window2027–2028years2026-09-09https://www.googlecloudpresscorner.com/2026-09-09-Google-Deepens-Commitment-to-Finland-with-Two-Year-EUR13-Billion-investment-in-AI-Infrastructure
Google–Fortum Loviisa PPAcontracted-delivery startSmaller capacity begins in 2028year2026-09-09https://www.fortum.com/en/media/2026/09/inside-information-fortum-and-google-partner-drive-sustainable-growth-finland-sign-nuclear-power-purchase-agreement
Meta–Oklo Ohio campusearliest delivery lag versus Prometheus target yearAt least 4 yearsyears2026-01-09https://oklo.com/newsroom/oklo-meta-announce-agreement-in-support-of-1-2-gw-nuclear-energy-development-in-southern-ohio2030 earliest first-phase year minus 2026 Prometheus target year
Meta–TerraPower Natrium agreementearliest delivery lag versus Prometheus target yearAt least 6 yearsyears2026-01-09https://www.terrapower.com/terrapower-announces-deal-with-meta2032 earliest initial-unit year minus 2026 Prometheus target year
Google–Fortum Loviisa PPAfull contracted share50% of plant capacity during 2030–2049percent of plant capacity2026-09-09https://www.fortum.com/en/media/2026/09/inside-information-fortum-and-google-partner-drive-sustainable-growth-finland-sign-nuclear-power-purchase-agreement
Meta–Vistra PPAsfuture incremental capacity433 MW of uprates fully online by 2034MW2026-01-09https://investor.vistracorp.com/2026-01-09-Vistra-and-Meta-Announce-Agreements-to-Support-Nuclear-Plants-in-PJM-and-Add-New-Nuclear-Generation-to-the-Grid
Meta–Vistra PPAsoperating nuclear capacity purchased2,176 MW from Perry and Davis-BesseMW2026-01-09https://investor.vistracorp.com/2026-01-09-Vistra-and-Meta-Announce-Agreements-to-Support-Nuclear-Plants-in-PJM-and-Add-New-Nuclear-Generation-to-the-Grid
Meta–TerraPower Natrium agreementprospective baseload capacity rightsUp to 2.8 GWGW2026-01-09https://www.terrapower.com/terrapower-announces-deal-with-meta
Google–Kairos Hermes 2prospective capacityUp to 50 MWMW2026-04-17https://www.kairospower.com/updates/kairos-power-breaks-ground-on-hermes-2-demonstration-plant
Meta–Oklo Ohio campusprospective full-build capacityUp to 1.2 GW by 2034GW2026-01-09https://oklo.com/newsroom/oklo-meta-announce-agreement-in-support-of-1-2-gw-nuclear-energy-development-in-southern-ohio
Meta–Vistra PPAspurchase startLate 2026year2026-01-09https://investor.vistracorp.com/2026-01-09-Vistra-and-Meta-Announce-Agreements-to-Support-Nuclear-Plants-in-PJM-and-Add-New-Nuclear-Generation-to-the-Grid
Google–Kairos Hermes 2target operating year2030year2026-09-21https://techcrunch.com/2026/09/21/kairos-power-gets-up-to-100m-from-samsung-group-to-build-nuclear-reactor-for-google
Meta Prometheus AI clustertarget year2026year2025-09-29https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai

Measurement technique

How to read this report

  1. 01Bounded the review to five AI-linked nuclear arrangements announced or materially updated by September 22, 2026: Google–Fortum, Google–Kairos, Meta–Vistra, Meta–Oklo and Meta–TerraPower.
  2. 02Classified each arrangement by underlying resource status: operating generation, future uprate, construction-stage project, or development-stage advanced reactor.
  3. 03Separated announced capacity, contractual form, construction or licensing status, and stated delivery timing rather than treating headline capacity as equivalent.
  4. 04Timeline: Meta’s Prometheus cluster was targeted for 2026; Meta–Vistra purchases start in late 2026; Google–Fortum starts at smaller capacity in 2028 and reaches its stated 50% share in 2030; Hermes 2 is targeted for 2030; Oklo’s first phase is targeted for 2030; TerraPower’s initial units are projected no earlier than 2032; Vistra uprates and Oklo’s full buildout are expected by 2034.
  5. 05Calculated only disclosed, date-comparable gaps: Oklo’s earliest first phase versus Prometheus’s target is at least four years, and TerraPower’s initial units versus that target are at least six years.

Sources

Evidence

10 publishers supporting 14 records. Expand a publisher to inspect its cited pages.

investor.vistracorp.cominvestor.vistracorp.com1 source / 3 records
engineering.fb.comengineering.fb.com1 source / 2 records
fortum.comfortum.com1 source / 2 records
oklo.comoklo.com1 source / 2 records
terrapower.comterrapower.com1 source / 2 records
googlecloudpresscorner.comgooglecloudpresscorner.com1 source / 1 record
Show 4 more publishers
Next report / 01AI Model Economics Index All research reports
YOUR READING SPACE

Notifications